Welcome to Agentic Protocol Tracking thatdrafts the protocol shell from the proposal itself.

The IRB clock is the silent serial step: teams celebrate the award, then discover the review takes ninety days and nobody filed. Risely's agents draft, assemble, and watch every clock, while the board reviews and the PI signs.

Protocols · the lab's clocks

watching

New study

shell drafted from the proposal · filed the day of submission

Renewal · 47 days out

continuing-review packet assembled · the PI signs, and it files

Amendment

new co-investigator · modification drafted the same week

Training

one certification expires next month · reminder already out

The shell drafts from the proposal itself.

The protocol files at submission time, so the ninety-day review runs while the sponsor is still deciding. The award arrives spendable, the postdoc offer goes out, and the first-year timeline stays real.

Two reviews, one calendar

Sponsor review of the proposal

Protocol review · filed the day of submission

The ninety-day review runs while the sponsor is still deciding, so the award that arrives is spendable on day one.

The silent serial step was never the review itself. The step was the months nobody started it.

The renewal assembles before the lapse can start.

At 47 days out, the continuing-review packet is already built from the study's own records. The PI signs, and it files. The lapse mid-collection, which is a compliance incident with a name on it, never happens.

The renewal, 47 days out

assembling

·Enrollment and progress summary
·Consent form, current version
·Adverse-event log, clean

The PI signs, and it files. The study that lapses mid-collection is a compliance incident, and this one never gets the chance.

Amendments happen in the right order.

A new co-investigator gets certified before the modification files, and touches data only after approval. The order sounds obvious, and without the clocks it almost never happens that way.

A person joins the study

1

Training certified

the new co-investigator completes it first

2

The modification files

the PI signs the draft the same week

3

Access granted

they touch data only after approval

The order sounds obvious and almost never happens by itself. The clocks make it the path of least resistance.

The board meets a finished packet.

Risely's agents assemble what the board reads. The review, the judgment, and the approval stay entirely the board's, because a human-subjects decision is nobody's to automate.

Who holds what

The packet, completeassembled by Risely's agents
The signaturethe PI's, always
The review and the decisionthe board's, entirely

Human-subjects review is a compliance surface with legal weight. The agents make the board faster and never make it smaller.

One person joins. The clocks re-run.

A new co-investigator, a protocol change, a training expiry. Any of them moves a clock somewhere, and every one runs the same way.

  1. A co-investigator joins

    mid-study, mid-semester

  2. The training check runs first

    their certification is verified current

  3. The amendment drafts

    the modification, ready the same week

  4. The PI signs, and it files

    in the right order for once

  5. The clocks re-set

    renewal and training, both visible

What changes, and how it runs.

Awards arrive spendable

The review ran while the sponsor was still deciding.

Studies stop lapsing mid-collection

The renewal packet assembles weeks before the date.

The board's time goes to judgment

Complete packets in, decisions out.

The technical read

Connects read-only to your protocol system, grants system, and training records to start

The board reviews and the PI signs, always

Every action lands on an append-only log

SOC 2 Type IIFERPAGDPR

Runs alongside what you have. Nothing rips out.